Skip to content

The Build

From dirt to doors.

Every step of the Bear Knuckle Garage build — Valley Lee, Maryland.

Tearing down the old shed
Step 1 — Tear down.
Cleared pad, ready to grade
Step 2 — Clear the lot.
Fresh gravel base
Step 3 — Grade and gravel.
Concrete slab poured
Step 4 — Pour the slab.
Steel frame going up
Step 5 — Frame it up.
Shop skinned with metal siding
Step 6 — Skin the walls.
Interior of the new shop
Step 7 — Inside the shell.
Roll-up doors installed
Step 8 — Doors installed.
Shop standing through the first snow
Step 9 — First snow.
Bear Knuckle Garage sign mounted
Step 10 — Sign goes up.